Delivered and waiting to be installed
Viewed: 48 times.
|
Bathtub frame
Viewed: 36 times.
|
Building inspector has been and the walls have been straightened ready for the plaster
Viewed: 42 times.
|
Wood shavings everywhere from the walls being straightened
Viewed: 50 times.
|
Bricks removed to make the beam straight - it must be easier to move the beam than pull the brick wall down
Viewed: 45 times.
|
Chateau Lisa
Viewed: 49 times.
|
The site has been cleaned and the brickie sand spread all over the driveway area - better than in the garden!
Viewed: 42 times.
|
Although the sand now contains traces of broken roof tiles... hrmm!
Viewed: 48 times.
|
My front door!!
Viewed: 50 times.
|